Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Occupancy Status   |   Clientele   |   Photogallery

Performance speaks louder than words - The record of Cyber Towers in HITEC City stretches from inauguration to 100% occupancy within 14 months. On 22nd November 1998, Cyber Towers - Phase-I of HITEC City, was inaugurated by the Prime Minister of India, Mr. Atal Behari Vajpayee. Today, the roster of occupants includes some of the most prestigious names in the sphere of business - including Microsoft, , Infosys, Oracle, GE Capital, HSBC..SignalTree Solutions,Toshiba

  • On Schedule, On Spec. From foundation-laying to final occupancy, Phase-I of HITEC City has moved ahead with performance matching plan every step of the way
  • Ultra-modern utilities Central air-conditioning, quality power supply from dedicated 33 KV substation with redundant feeders, DG back-up.. everything for a hassle-free working environment
  • The sincerest form of customer approval is a 'repeat order'. Several occupants of Phase-I finalised plans for expansion into Phase II

TECHNICAL DETAILS
  • ReinforcedCementConcrete(RCC) Framed structure with pre-cast modular slab elements

  • IndianPatentStone(IPS) Flooring, OilBoundDistemper(OBD) Wall Finish in the office modules

  • Homogeneous Vitrified Tile Flooring in Lobbies & Toilets · Polished Granite cladding for Lift Lobby Fascia

  • Dedicated 33 kV substation with incoming redundant feeders backed by a DieselGenerator plant

  • Concealed Copper wiring for power & LV systems

  • Screened Cables & segregation of power, data/voice cables to avoid interference, etc.

  • Backbone Structured cabling, wired upto workstations for a ready operation, using ECAT-5 and CAT-3 cables.

  • Optic fibre link to other buildings in HITEC City.

  • Building Automation Systems.

  • Ample high speed vertical transportation with 12 elevators.

  • Centralised air-conditioning plant with independent Air Handling Unt's's for each office module and controls for various climatic conditions.

  • Dedicated Server room air-conditioning.

  • Comprehensive Fire Protection System comprising of Hydrant, Automatic Sprinkler and Fire Alarm & Smoke Detection Systems.

  • Ample covered and open parking